Basement floor tile lifted where new beam posts need footings
Example project
- Home
- Golden Valley rambler from the 1950s; the basement family room has a tile floor
- Original request
- Take out the wall between the kitchen and living room and carry the load on a new beam
- Testing
- An MDH-certified inspector takes one sample of the 9-inch tile and a separate one of the black adhesive
- Found
- Positive results for the 9-inch tile and for the black adhesive
- Area
- About 70 sq ft in two patches where the posts land
- Work
- Tile pried up whole, the adhesive taken off wet down to the concrete
- Timeline
- Five-day notice, then one working day
- Cost
- $1,950
In this example, the owners of a 1950s rambler in Golden Valley want one open room where the kitchen and living room now meet. A new beam will carry the load, and two posts under it need footings cut into the basement slab, right through the family room floor.